Hackers turned the tallest building on main campus into the world's largest VU meter to go along with the Boston Pop's annual July 4th concert. The slits at the top of the building used by the hackers are ventilation slits on the 19th floor of the 20-story Earth, Atmoshperic, and Planetary Sciences (EAPS) building.